  1. Destruction of electrical towers in La Oroya

    On July 22, 1989, a Shining Path column destroyed three electrical towers in La Oroya. This attack was part of a series of terrorist actions by the PCP-Sendero Luminoso against the infrastructure of mining companies in central Peru. Attacks against electrical towers and other mining facilities intensified during 1989, causing …

    La Oroya, Junín, Perú Informe CVR, p. 220
  2. Shining Path attack on electrical substation in La Oroya

    On July 8, 1989, Shining Path dynamited an electrical substation in La Oroya. This attack was part of a series of terrorist actions against the infrastructure of the mining company Centromín Perú in the area. The dynamiting attacks continued throughout 1989, seriously affecting mining operations and the sector's economy. Days …

    La Oroya, Junín, Perú Informe CVR, página 219
  3. Dynamiting of electrical substation in Santa Rosa, La Oroya

    On July 8, 1989, hikers dynamited an electrical substation near the Santa Rosa housing complex in La Oroya. As a direct consequence of this attack, the copper and lead refineries of Centromín Perú were paralyzed. The attack also affected the local electricity supply in the city. This attack was part …

    Santa Rosa, La Oroya, Junín, Perú Informe CVR, p. 209
  4. Shining Path attack on Huariaca power plant

    On December 31, 1988, Shining Path dynamited a power plant located in Huariaca, Cerro de Pasco province. This plant was crucial to the energy supply of several important mining sites in the region, including Milpo, Atacocha and Chicrín. The attack was part of a series of terrorist actions against mining …

    Huariaca, Cerro de Pasco, Perú Informe CVR, página 219
  5. Assassination of republican guards in San Juan de Lurigancho

    On January 10, 1985, four subversives assassinated two Republican guards who were guarding a high-voltage tower in the district of San Juan de Lurigancho, Lima. This attack was part of the PCP-Sendero Luminoso's strategy of attacking electrical infrastructure and eliminating members of the forces of law and order. The attack …

    San Juan de Lurigancho, Lima, Perú Informe CVR, página 100
  6. Demolition of electric tower in Pazos

    On August 1, 1984, militants of the PCP-Sendero Luminoso knocked down an electrical system tower in the district of Pazos, province of Tayacaja. This attack was part of the Shining Path's strategy of sabotaging the region's electrical infrastructure. The attack took place in a context where military pressure was increasing, …

    Pazos, Tayacaja, Huancavelica, Perú Informe CVR, página 220
  7. General blackout in Lima

    On the night of November 24, 1981, about a hundred people staged a riot in the center of Miraflores, causing material damage to the branches of the Credito and Continental banks. The group exploded several Molotov cocktails shouting 'down with the government', 'the guerrilla is the way' and 'the guerrilla …

    Lima, Perú Informe CVR (páginas 455-459)
  8. Demolition of high voltage tower in Chambará

    On December 13, 1980, alleged subversives dynamited a high tension tower of the interconnection line of the Mantaro Hydroelectric Power Plant in the district of Chambará, province of Concepción. This attack was part of the first subversive actions of the PCP-SL in the city of Huancayo and the Mantaro valley. …

    Chambará, Concepción, Junín, Perú Informe CVR, página 180
  9. Demolition of high-voltage electrical towers

    Between 1980 and 1991, the subversion caused the loss of two billion dollars by destroying the structure of high-tension electricity towers. According to ELECTRO-PERU, the number of towers demolished in 1989 was 335. Total losses were estimated at US$ 600 million according to ELECTRO-PERU. This destruction of electrical infrastructure was …

    Perú Informe CVR, páginas 4358-4359