  1. Dynamite attack on Yamobamba hydroelectric power plant

    On July 18, 1993, the PCP-Sendero Luminoso carried out a bomb attack that completely destroyed the Yamobamba hydroelectric plant, which supplied electricity to the city of Huamachuco. As a result of the attack, the entire city was without electricity for more than 8 months. This attack took place in the …

    Yamobamba, Huamachuco, Sánchez Carrión, La Libertad, Perú Informe CVR
  2. Blasting of La Oroya hydroelectric power plant pipeline

    On December 30, 1988, at 11:25 pm, three explosions blew up the 1.80 meter diameter pipe that fed water to the La Oroya hydroelectric plant. This attack was part of a series of attacks against Centromín Perú facilities during the 1988 Christmas season. The attacks occurred in the context of …

    La Oroya, Perú Informe CVR, página 345
  3. Construction of Machu Picchu Hydroelectric Plant and Cachimayo Mill

    In 1965, the Machu Picchu Hydroelectric Plant and the Cachimayo Fertilizer Factory were built as part of the urban modernization process of the city of Cuzco. These works were the result of the reconstructive action of the State after the 1950 earthquake that destroyed the city. The construction of these …

    Cuzco, Perú Informe CVR, páginas 251-252